B2Gold spent N$72 million on Otjikoto exploration in 2023

B2Gold has revealed that it spent in excess of N$72 million on exploration at its Otjikoto gold mine in Namibia in 2023 surpassing the N$64 million that was invested in the year 2022.

Full year financial results for the 2023 financial year also show that the gold miner deployed CAPEX of approximately N$1.1 billion.

The Otjikoto mine, in which the Company holds a 90% interest, had a strong finish to 2023 and produced an annual record of 208,598 ounces of gold, at the upper end of the guidance range of 190,000 to 210,000 ounces, mainly due to improved processed grade as a result of higher-grade ore mined from the Wolfshag underground mine.

On January 31, 2024, the Company announced positive exploration drilling results from the Antelope deposit at the Otjikoto Mine. The Antelope deposit, comprised of the Springbok Zone, the Oryx Zone, and a possible third structure, Impala, subject to further confirmatory drilling, is located approximately 3 km south of the Otjikoto Phase 5 open pit. The Antelope deposit has the potential to be developed as an underground mining operation, which could complement the expected processing of low-grade stockpiles at the Otjikoto mill from 2026 through 2031.

Overall, B2Gold executed another year of aggressive exploration in 2023 incurring US$78 million (about N$1.4 billion) (including US$2 million of target generation costs included in other operating expenses in the Consolidated Statement of Operations) compared to a revised budget of approximately US$84 million (original budget of US$64 million). Exploration in 2023 was focused predominantly in Mali, other operating mine sites in Namibia and the Philippines, both infill and generative exploration at the Back River Gold District, as well as a continued focus on grassroots targets around the world.

B2Gold is planning another year of extensive exploration in 2024 with a budget of approximately US$63 million. A significant focus will be exploration at the Back River Gold District, with the goal of enhancing and growing the significant resource base at the Goose Project and surrounding regional targets.

In Namibia, the exploration program at the Otjikoto Mine will be the largest program since 2012, with 39,000 meters of drilling planned to define and expand the recently discovered Antelope deposit.

In Mali, the exploration program will be a more strategic search for near-mine, near-surface sources of additional sulphide-related gold mineralization. In the Philippines, the exploration program at Masbate will focus on converting inferred mineral resource areas and expanding the existing open pits. Early-stage exploration programs will continue in Finland, the Philippines, and Cote d’Ivoire in 2024. Finally, the search for new joint ventures and strategic investment opportunities will continue, building on existing equity investments in Snowline Gold Corp. and Matador Mining Ltd.

The Otjikoto Mine is expected to produce between 180,000 and 200,000 ounces of gold in 2024 at cash operating costs of between US$685 and US$745 per ounce and all-in sustaining costs of between US$960 and US$1,020 per ounce.

“Gold production at Otjikoto is expected to be relatively consistent throughout 2024. For 2024, Otjikoto is expected to process a total of 3.4 million tonnes of ore at an average grade of 1.77 g/t with a process gold recovery of 98.0%. Processed ore will be sourced from the Otjikoto pit and the Wolfshag underground mine, supplemented by existing medium and high-grade ore stockpiles,” Clive Johnson, President and Chief Executive Officer said.

Capital expenditures in 2024 at Otjikoto are expected to total US$33 million, of which approximately US$32 million is classified as sustaining capital expenditures and US$1 million is classified as non-sustaining capital expenditures. Sustaining capital expenditures are anticipated to include $32 million for deferred stripping and deferred underground development.

For the year ended December 31, 2023, mill feed grade was 1.91 g/t, mill throughput was 3.44 million tonnes, and gold recovery averaged 98.6%. In the fourth quarter of 2023, the Otjikoto Mine produced a quarterly record of 81,111 ounces of gold. For the fourth quarter of 2023, mill feed grade was 2.88 g/t, mill throughput was 0.89 million tonnes, and gold recovery averaged 98.5%.

“As of the beginning of 2023, the Probable Mineral Reserve estimate for the Wolfshag deposit included 203,000 ounces of gold in 1.1 million tonnes of ore at an average grade of 5.55 g/t gold. Open pit mining operations at the Otjikoto Mine are scheduled to ramp down throughout 2024 and conclude in 2025, while underground mining operations at Wolfshag are expected to continue through 2026. Processing operations will continue through 2031, when economically viable stockpiles are forecast to be exhausted,” Johnson said.

Leave a Reply

Your email address will not be published. Required fields are marked *